TearDrop Construction Progress Jan 2004

thumbnail
What CUTE windows! :-)
thumbnail
The galley door is heaveir than expected. The icechest slides on a shelf, with latches to hold it in place when not being slid out. Under counter shelf too.
thumbnail
Wad of wires goes to the tail lights, back up lights, etc.
thumbnail
thumbnail
These 1" eye loops are not staying. I want the low "Footman loops" since I prefer flat webbing straps to tie everything down, not rope.
thumbnail
thumbnail
Headboard compartment down
thumbnail
Headboard compartment up.
thumbnail
thumbnail
Hello!
thumbnail
thumbnail
thumbnail
Comparing the old bumper & what will soon be the new one. I'm making a new one that will be a bit sturdier, and have all the holes drilled right.
thumbnail
Hey, wanna hear something Grate?
thumbnail
BusStop shows the proper way to grind metal
thumbnail
Grinding off the sharp edges of the bumper
thumbnail
The finished Boulder Bumper! Now I just have to install the wiring. Those extra tabs under the bumper are so the Hi-Lift Jack won't slip off when it's being Jacked up.
<-BACK